Bush-hog PT5 Manuale Utente

Navigare online o scaricare Manuale Utente per Apparecchi da giardinaggio Bush-hog PT5. Bush Hog PT5 User Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 80
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
©2010 Alamo Group Inc.
$0.00
41886005 .oN traP C
OPERATOR’S MANUAL
BUSH HOG
®
2501 Griffin Ave.
Selma, AL 36703
334-874-2700
www.bushhog.com
SICKLE BAR
BOOM MOWER
This Operator's Manual is an integral part of the safe operation of this machine and must
be maintained with the unit at all times. READ,
UNDERSTAND, and FOLLOW the Safety
and Operation Instructions contained in this manual before operating the equipment. C01-
Cover
PT5
Published 09/10
Revised 03/11
Vedere la pagina 0
1 2 3 4 5 6 ... 79 80

Sommario

Pagina 1 - OPERATOR’S MANUAL

©2010 Alamo Group Inc.$0.0041886005 .oN traP COPERATOR’S MANUAL BUSH HOG®2501 Griffin Ave. Selma, AL 36703334-874-2700www.bushhog.comSICKLE BA

Pagina 2 - To the Owner/Operator/Dealer

SAFETYPT5 09/10 Safety Section 1-4© 2010 Alamo Group Inc.SAFETYNever allow children to operate, ride on, or come close to the Tractor orImplement.

Pagina 3

SAFETYPT5 09/10 Safety Section 1-5© 2010 Alamo Group Inc.SAFETYPROLONGED EXPOSURE TO LOUD NOISE MAY CAUSEPERMANENT HEARING LOSS! Tractors with or w

Pagina 4

SAFETYPT5 09/10 Safety Section 1-6© 2010 Alamo Group Inc.SAFETYPeriodically inspect all moving parts for wear and replace whennecessary with authori

Pagina 5 - TABLE OF CONTENTS

SAFETYPT5 09/10 Safety Section 1-7© 2010 Alamo Group Inc.SAFETYNEVER use drugs or alcohol immediately before or while operating theTractor and Imple

Pagina 6

SAFETYPT5 09/10 Safety Section 1-8© 2010 Alamo Group Inc.SAFETYThe rotating parts of this machine have been designed and tested for rugged use.Howev

Pagina 7 - SAFETY SECTION

SAFETYPT5 09/10 Safety Section 1-9© 2010 Alamo Group Inc.SAFETYReplace bent or broken blades with new blades. NEVER ATTEMPT TO STRAIGHTEN,WELD, OR

Pagina 8 - Safety Messages

SAFETYPT5 09/10 Safety Section 1-10© 2010 Alamo Group Inc.SAFETYBe particularly careful when transporting the Implement with the Tractor. Turn curv

Pagina 9

SAFETYPT5 09/10 Safety Section 1-11© 2010 Alamo Group Inc.SAFETYThis Implement may be wider than the Tractor. Be careful when operating or transpo

Pagina 10

SAFETYPT5 09/10 Safety Section 1-12© 2010 Alamo Group Inc.SAFETYDecal LocationNOTE: Bush Hog supplies safety decals on this product to promote safe

Pagina 11

SAFETYPT5 09/10 Safety Section 1-13© 2010 Alamo Group Inc.SAFETYITEM PART NO. QTY TYPE DESCRIPTION1. 02967827 1 DANGER Multiple Hazard Rotary2. 02

Pagina 12

To the Owner/Operator/DealerAll implements with moving parts are potentially hazardous. There is no substitute for a cautious, safe-mindedoperator who

Pagina 13 - (SGM-02)

SAFETYPT5 09/10 Safety Section 1-14© 2010 Alamo Group Inc.SAFETYDecal DescriptionDANGER! - Multi Hazard - Failure to follow SafetyMessages and Opera

Pagina 14

SAFETYPT5 09/10 Safety Section 1-15© 2010 Alamo Group Inc.SAFETYDANGER! - Multi-Hazard Boom. Take precautionswhile transporting and operating Boom

Pagina 15 - (S3PT-1)

SAFETYPT5 09/10 Safety Section 1-16© 2010 Alamo Group Inc.SAFETYDANGER! Crushing and Pinch Points.Moving machinery parts can pinch or crush or fall-

Pagina 16

SAFETYPT5 09/10 Safety Section 1-17© 2010 Alamo Group Inc.SAFETYModel Name - PT5 PowertrimP/N 50068742Operator's Manual (with repair parts) and

Pagina 17 - (SPBH-1)

SAFETYPT5 09/10 Safety Section 1-18© 2010 Alamo Group Inc.SAFETYFederal Laws and RegulationsThis section is intended to explain in broad terms the c

Pagina 18

Introduction Section 2-1INTRODUCTION SECTION

Pagina 19

INTRODUCTIONPT5 09/10 Introduction Section 2-2© 2010 Alamo Group Inc.INTRODUCTIONThis PT5 Sickle Bar is designed with care and built with quality ma

Pagina 20 - Decal Description

INTRODUCTIONPT5 09/10 Introduction Section 2-3© 2010 Alamo Group Inc.INTRODUCTIONThe sickle bar boom is designed for medium-duty work. They can cut

Pagina 21

INTRODUCTIONPT5 09/10 Introduction Section 2-4© 2010 Alamo Group Inc.INTRODUCTIONAttention Owner/OperatorBEFORE OPERATING THIS MACHINE:1. Carefully

Pagina 22

Assembly Section 3-1ASSEMBLY SECTION

Pagina 23

In order to reduce accidents and enhance the safe operation of mowers, Bush Hog, in cooperation withother industry manufacturers has developed the AEM

Pagina 24 - Federal Laws and Regulations

ASSEMBLYPT5 09/10 Assembly Section 3-2© 2010 Alamo Group Inc.ASSEMBLYTRACTOR SELECTIONThe PT5 is specifically designed to be fitted to all tractors

Pagina 25 - INTRODUCTION SECTION

ASSEMBLYPT5 09/10 Assembly Section 3-3© 2010 Alamo Group Inc.ASSEMBLYCOUPLING UP HYDRAULICSConsult the tractor’s handbook for correct installation o

Pagina 27

Operation Section 4-1OPERATION SECTION

Pagina 28

OPERATIONPT5 09/10 Operation Section 4-2© 2010 Alamo Group Inc.OPERATIONBUSH HOG PT5 OPERATING INSTRUCTIONSBush Hog PT5s are manufactured with quali

Pagina 29 - ASSEMBLY SECTION

OPERATIONPT5 09/10 Operation Section 4-3© 2010 Alamo Group Inc.OPERATION1. Standard Equipment and SpecificationsStandard SpecificationsCAT I Three P

Pagina 30 - ASSEMBLY

OPERATIONPT5 09/10 Operation Section 4-4© 2010 Alamo Group Inc.OPERATION2. OPERATOR REQUIREMENTSSafe operation of the unit is the responsibility of

Pagina 31

OPERATIONPT5 09/10 Operation Section 4-5© 2010 Alamo Group Inc.OPERATION3. TRACTOR REQUIREMENTSIn addition to tractor horsepower and size required t

Pagina 32

OPERATIONPT5 09/10 Operation Section 4-6© 2010 Alamo Group Inc.OPERATION3.4 Tractor HorsepowerThe horsepower required to operate the mower depends o

Pagina 33 - OPERATION SECTION

OPERATION7-4 noitceS noitarepO01/90 5TP© 2010 Alamo Group Inc.OPERATION3.6 Hydraulics3.7 Front End WeightA minimum of 20% total tractor weight must

Pagina 34 - OPERATION

Bush Hog Division is willing to provideone (1) AEM Mower Safety Practices VideoPlease Send Me: VHS Format – AEM/FEMA Mower Operator Safety Video DVD F

Pagina 35

OPERATIONPT5 09/10 Operation Section 4-8© 2010 Alamo Group Inc.OPERATION4. GETTING ON AND OFF THE TRACTORBefore getting onto the tractor, the operat

Pagina 36

OPERATIONPT5 09/10 Operation Section 4-9© 2010 Alamo Group Inc.OPERATIONBEFORE leaving the tractor seat, always set the parking brake and/or setthe

Pagina 37

OPERATIONPT5 09/10 Operation Section 4-10© 2010 Alamo Group Inc.OPERATIONStart tractor only when properly seated in the Tractor seat. Starting atra

Pagina 38

OPERATIONPT5 09/10 Operation Section 4-11© 2010 Alamo Group Inc.OPERATION6. CONNECTING THE IMPLEMENT TO TRACTOR1. Unbolt the upper halves of the yok

Pagina 39

OPERATIONPT5 09/10 Operation Section 4-12© 2010 Alamo Group Inc.OPERATIONPeriodically inspect all moving parts for wear and replace whennecessary wi

Pagina 40

OPERATIONPT5 09/10 Operation Section 4-13© 2010 Alamo Group Inc.OPERATION7.2 Boom Unit Pre-Operation Inspection and ServiceInspect and service the b

Pagina 41

OPERATIONPT5 09/10 Operation Section 4-14© 2010 Alamo Group Inc.OPERATIONFRAME ASSEMBLY• Inspect condition of mounting frame weldment.• Inspect cond

Pagina 42

OPERATIONPT5 09/10 Operation Section 4-15© 2010 Alamo Group Inc.OPERATIONSICKLE BAR INSPECTION• Inspect blade and bolts for looseness andexcessive w

Pagina 43

OPERATIONPT5 09/10 Operation Section 4-16© 2010 Alamo Group Inc.OPERATIONAvoid contact with hot surfaces including hydraulic oil tanks, pumps, motor

Pagina 44

OPERATIONPT5 09/10 Operation Section 4-17© 2010 Alamo Group Inc.OPERATIONSickle Bar PRE-OPERATION InspectionMower ID#_______________________Make____

Pagina 45

TABLE OF CONTENTSSAFETY SECTION ...1-1Safet

Pagina 46

OPERATIONPT5 09/10 Operation Section 4-18© 2010 Alamo Group Inc.OPERATIONTractor PRE-OPERATION InspectionTractor ID#:________________________Make:__

Pagina 47

OPERATIONPT5 09/10 Operation Section 4-19© 2010 Alamo Group Inc.OPERATION8. OPERATING THE IMPLEMENT8.1 Machine ControlsFour levers individually cont

Pagina 48

OPERATIONPT5 09/10 Operation Section 4-20© 2010 Alamo Group Inc.OPERATION8.2 Arm Controls

Pagina 49

OPERATIONPT5 09/10 Operation Section 4-21© 2010 Alamo Group Inc.OPERATION8.3 Forward SpeedThis is a matter of common sense and experience. It must b

Pagina 50

OPERATIONPT5 09/10 Operation Section 4-22© 2010 Alamo Group Inc.OPERATION9. DRIVING THE TRACTOR AND IMPLEMENTSafe tractor transport requires the ope

Pagina 51

OPERATIONPT5 09/10 Operation Section 4-23© 2010 Alamo Group Inc.OPERATIONTransport only at speeds where you can maintain control of theequipment. Se

Pagina 52

OPERATIONPT5 09/10 Operation Section 4-24© 2010 Alamo Group Inc.OPERATION9.2 Brake and Differential Lock SettingMake sure the tractor brakes are in

Pagina 53

OPERATIONPT5 09/10 Operation Section 4-25© 2010 Alamo Group Inc.OPERATION9.3 Driving the Tractor and BoomStart off driving at a slow speed and gradu

Pagina 54

OPERATIONPT5 09/10 Operation Section 4-26© 2010 Alamo Group Inc.OPERATION10. OPERATING THE TRACTOR AND IMPLEMENTTHE OPERATOR MUST COMPLETELY UNDERST

Pagina 55

OPERATIONPT5 09/10 Operation Section 4-27© 2010 Alamo Group Inc.OPERATION10.1 Foreign Debris Hazards/Overhead ObstructionsAn area to be cut must fir

Pagina 56

OPERATING THE TRACTOR AND IMPLEMENT ...4-26Foreign Debris Haza

Pagina 57

OPERATIONPT5 09/10 Operation Section 4-28© 2010 Alamo Group Inc.OPERATION10.3 Operating the Attached Head• Objects tend to be thrown out from undert

Pagina 58

OPERATIONPT5 09/10 Operation Section 4-29© 2010 Alamo Group Inc.OPERATION10.4 Shutting Down the ImplementTo shut down attached boom head, first brin

Pagina 59

OPERATIONPT5 09/10 Operation Section 4-30© 2010 Alamo Group Inc.OPERATION12. DISCONNECTING THE IMPLEMENT1. Select a firm level site.2. Replace the s

Pagina 60

OPERATIONPT5 09/10 Operation Section 4-31© 2010 Alamo Group Inc.OPERATIONBefore transporting the tractor between locations, idle the tractor engine,

Pagina 61

OPERATIONPT5 09/10 Operation Section 4-32© 2010 Alamo Group Inc.OPERATIONNever allow children or other persons to ride on the Tractor or Implement.F

Pagina 62

OPERATIONPT5 09/10 Operation Section 4-33© 2010 Alamo Group Inc.OPERATIONWhen operating on public roads, haveconsideration for other road users. Pul

Pagina 63

OPERATIONPT5 09/10 Operation Section 4-34© 2010 Alamo Group Inc.OPERATION13.2 Hauling the Tractor and ImplementBefore transporting a loaded tractor

Pagina 64

OPERATIONPT5 09/10 Operation Section 4-35© 2010 Alamo Group Inc.OPERATION14. TROUBLESHOOTING GUIDEHYDRAULIC CYLINDER NOT WORKING -Check level of hyd

Pagina 66

Maintenance Section 5-1MAINTENANCE SECTION

Pagina 67

Safety Section 1-1SAFETY SECTION

Pagina 68

MAINTENANCEPT5 09/10 Maintenance Section 5-2© 2010 Alamo Group Inc.MAINTENANCELUBRICATIONRefer to the lubrication diagram and grease daily all point

Pagina 69 - MAINTENANCE SECTION

MAINTENANCEPT5 09/10 Maintenance Section 5-3© 2010 Alamo Group Inc.MAINTENANCECUTTERBARAdjusting the Knife GuidesBefore commencing any checks or adj

Pagina 70 - MAINTENANCE

MAINTENANCEPT5 09/10 Maintenance Section 5-4© 2010 Alamo Group Inc.MAINTENANCESharpening the KnifeAfter five to twenty operating hours, depending on

Pagina 71

MAINTENANCEPT5 09/10 Maintenance Section 5-5© 2010 Alamo Group Inc.MAINTENANCEHYDRAULIC RAMSRam Seal Replacement- General Information1. Whenever pos

Pagina 72

MAINTENANCEPT5 09/10 Maintenance Section 5-6© 2010 Alamo Group Inc.MAINTENANCECylinder Rod MaintenanceIt is important to visually inspect the hydrau

Pagina 73

MAINTENANCEPT5 09/10 Maintenance Section 5-7© 2010 Alamo Group Inc.MAINTENANCEReplacing Spool “O” RingsNote: Owing to the sharp edges in the design

Pagina 74

MAINTENANCEPT5 09/10 Maintenance Section 5-8© 2010 Alamo Group Inc.MAINTENANCEHose WarrantyWarranty is limited to replacement which have failed due

Pagina 75

MAINTENANCEPT5 09/10 Maintenance Section 5-9© 2010 Alamo Group Inc.MAINTENANCE

Pagina 76

LIMITED WARRANTYBush Hog warrants to the original purchaser of any new Bush Hog equipment, purchased from an authorized

Pagina 77

TO THE OWNER/OPERATOR/DEALERTo keep your implement running efficiently and safely, read your manual thoroughly and follow these directionsand the Saf

Pagina 78 - LIMITED WARRANTY

SAFETYPT5 09/10 Safety Section 1-2© 2010 Alamo Group Inc.SAFETYSafety MessagesA careful operator is the best operator. Safety is of primary importan

Pagina 79

PT5 POWERTRIM - SOM - 09/10 (Revised 03/11) P/N 50068814CPrinted in USAP

Pagina 80 - SICKLE BAR BOOM MOWER

SAFETYPT5 09/10 Safety Section 1-3© 2010 Alamo Group Inc.SAFETYNever operate the Tractor or Implement until you have read andcompletely understand t

Commenti su questo manuale

Nessun commento